Banner Image

All Services

Engineering & Architecture

CAD & AutoCAD

Construction analysis for a cable stayed bridge of 1081m main span now under construction. Design of a suspension bridge of 1317m main span (not constructed). Design of a 900m long perstressed concrete deck on sea. Design and construct a 3km long sewerage and drainage system underground in urban build up area. Fluid dynamic analysis with FLUENT

About

$110/hr Ongoing

Download Resume

Construction analysis for a cable stayed bridge of 1081m main span now under construction. Design of a suspension bridge of 1317m main span (not constructed). Design of a 900m long perstressed concrete deck on sea. Design and construct a 3km long sewerage and drainage system underground in urban build up area. Fluid dynamic analysis with FLUENT

Skills & Expertise

AnalysisConstructionDesignSAPSAP 2000

0 Reviews

This Freelancer has not received any feedback.

Browse Similar Freelance Experts