Banner Image

Skills

  • Architecture Drawings
  • Bid Management
  • Bluebeam Revu
  • Civil Engineering
  • Construction
  • Construction Residential
  • Cost Estimation
  • Electrical
  • Estimate
  • Estimating
  • Estimation
  • Estimation and Costing
  • Estimator
  • Grading
  • Hvac

Sign up or Log in to see more.

Services

  • Construction Full trade Estimate

    $25/hr Starting at $150 Ongoing

    Dedicated Resource

    If you are working on a construction project and worry about project cost. I'm sure you need a precise construction estimate, material takeoff, and quantity takeoff. And who knows all of this off the...

    Architecture DrawingsBid ManagementBluebeam RevuCivil EngineeringConstruction

About

Construction Estimator

I am a Civil Engineer specializing in Professional Bidding Estimates for Civil Engineering projects in the US, UK, Canada, and Australia Construction industry. I provide cost estimation and Quantity take-off Services for all types of construction, residential, and commercial Projects. Accuracy in work is a primary focus. Fast delivery and ready-to-bid Excel file. Please let me know if there is a process by which we can collaborate, or provide me the PDF files or links whenever you have them for estimating and I will give you a service proposal based on your Project.

The Software which I use for Takeoff and Estimating

1. Planswift
2. Bluebeam
3. Excel

The resources that I use for Pricing

1. RS Means
2. Latest Rate from the Internet (Include Different authentic Websites)

***I cover all CSI Divisions which are listed below***

General Requirements Subgroup

1. General Requirements

Facility Construction Subgroup

2. Existing Conditions
3. Concrete
4. Masonry
5. Metals
6. Wood, Plastics, and Composites
7. Thermal and Moisture Protection
8. Openings
9. Finishes
10. Specialties
11. Equipment
12. Furnishings
13. Special Construction
14. Conveying Equipment

Facility Services Subgroup:

21. Fire Suppression
22. Plumbing
23. Heating, Ventilating, and Air Conditioning (HVAC)
25. Integrated Automation
26. Electrical
27. Communications
28. Electronic Safety and Security

Site and Infrastructure Subgroup:

31. Earthwork
32. Exterior Improvements
33. Utilities
34. Transportation
35. Waterway and Marine Construction

Get your Quote Today

Kind Regards

Abdul Rehman

Work Terms

50% Advance and 50% after completion of the Project.
Also, depends on the communication which will done in the inbox.

Attachments (Click to Preview)