    I am Mechanical Design Engineer with 2 years of experience in design & development of Press tools, Line Replacement Units, Pharma Equipment's, Fabrication and Sheet-metal Enclosures., I execute all the...

    3D3D Design3D ModelingAutocad Civil3DCatia

About

Stress Analysis Jobs Accomplishments:
• Stress Analysis of Pipelines of Rumaitha & Shanayel Facilities-Phase-III,NorthEast Bab,ADCO, 120 km Underground & Above ground 26” Oil Export Pipeline.
• Stress Analysis of API 10000 Gas Injection Pipeline of 23.5 Km.
• Stress Analysis of Water Injection Pipeline of 24 Km.
• Man Hour Estimation, R&R Preparation & Man Power Planning.
• Preparation of ITB summary/ Query ,flexibility spec & Work Instructions
• P&ID Mark-up
• Stress critical line list preparation
• Selection of Pipe supports, spring and rod hangers.
• Designing of special support.
• Model analysis for frequency check.
• Trunion check.
• Analysis of Sphere Pump, Exchangers, Vessels, Column, Reboiler, Fire Heater,Plate fin Exchanger, Air Coolers connected lines
• Analysis of blower lines
• Combine analysis of Reciprocating and Centrifugal compressor lines.
• Combine analysis of turbine lines.
• Analysis of PSV lines (open and close)
• Seismic and Wind analysis for lines
• Analysis of line up to Super Critical Lines with High temperature 550C to -230 c .
• Analysis of flange leakage as per ASME Section VIII and pressure equivalent method.
• Preparation of spring material requisition.
• Preparation of expansion joint material requisition
• Preparation of many work instruction of wind, seismic, dynamic analysis, jacket pipe etc.
• Preparation of ITB summary/technical Query.
• FEA analysis
• WRC 107/297
• Knowledge of International codes and standards.
• worked as co-coordinator for checking of critical piping stress analysis work done by Engineers India Ltd. In PDIL
• Completed Cross Country Pipeline for Burrup Fertilizer Project (Ammonia Transfer line from Ammonia storage tank to loading station at Jetty) in PDIL
• Piping Stress Analysis of Catalytic Cyclemax Regeneration Plant in Technip KTI.
• Carried out stress analysis of Ammonia line between
storage tank and Ammonia transfer pumps for Indo–Oman Fertilizer Project.
• Worked as Area Stress lead Engineer

Founded: 1998