Send before Aug 13, 2025
Subject: Brilla Coffee – HVAC Assessment, Load Calculation & Ductwork Redesign Proposal Scope of Work We’ve been asked to: Redesign and correct the existing ductwork Evaluate the ERV system (and repl…
United States
409 Spent | 100%
Send before Aug 10, 2025
Product/Mechanical Designer Needed to Develop Manual Biodegradable Packaging Machine & Molds Project Type: One-time project (with potential long-term collaboration) Location: Remote - Preferably EU…
Netherlands
838 Spent | 100%