Send before Aug 14, 2025
The project is to perform air flow analysis of air exiting a camera enclosure shown in the attached drawing. The goal is to ensure unform flow without any low-pressure regions. The enclosure will be u…
United States
1,009 Spent | 100%
Send before Aug 13, 2025
Subject: Brilla Coffee – HVAC Assessment, Load Calculation & Ductwork Redesign Proposal Scope of Work We’ve been asked to: Redesign and correct the existing ductwork Evaluate the ERV system (and repl…
409 Spent | 100%
Send before Aug 12, 2025
The Brussels Paper - A business concept designed to recover the global economy by advancing human nature. This paper emphasizes the importance of addressing global challenges by connecting our heads w…
Hong Kong
58,264 Spent | 95.2%
Send before Jul 20, 2025
HIRING: Electrical Engineer to Help Build Ozone Water Treatment System We’re building a plug-and-play ozone water treatment system using PEM-based electrolytic ozone — no chemicals, no air pumps, just…
250,287 Spent | 100%
Send before Aug 07, 2025
Introduction My research on humanity has led me to create a system which supports an ideal global lifestyle for us and generations to come. I call it the Heart to Heart (H2H) business model, designed …