Posted 1 Hours Ago Job ID: 2119148 5 quotes received

2D architecture factory + office design

Featured
HourlyNo rate specified1-10 hrs/wk1-5 days
Quotes (5)  ·  Premium Quotes (0)  ·  Invited (0)  ·  Hired (0)

  Send before: July 31, 2026

Send a Quote

Design & Art Interiors / Exteriors / Furniture / Landscapes

Looking for an experienced CAD drafter to modify and improve a project with attached preliminary CAD file. The project involves adding additional details, elevations, refining the current design to meet updated specifications, and exterior and interior snapshots rendering whenever possible. Attention to detail and proficiency in CAD software are essential. Here are some details:

Please find the details below regarding the factory land and building specifications:

Site Dimensions and Setbacks 

- Lot Size: 80m x 60m. 

- Setbacks: There is a 5m restriction on all sides; however, we have maintained a 10m setback on the street side to accommodate the entrance and parking.

Design References

I have attached several files for your reference: 

- A symbolic drawing (note: some details have since changed). 

- ChatGPT-generated floor layouts and an exterior view of the office building. 

- Layouts for the factory lockers and bathrooms. 

- PDF/CAD drawings and reference photos of factory exteriors to assist with the placement of emergency doors and windows for natural light on both stories.

Building Specifications 

- Office Building: A three-story glass structure. Each floor is 14ft high, allowing for a 12ft drop ceiling with 2ft of plenum space for utilities. You can be creative and don't have to stick to the look provided by the AI generated pictures. Note that the second and third floors are extended out to create parking area below in front of the first floor.  - Factory Building: A two-story, metal-frame structure with 20ft ceilings per level. The second floor can be a 5" concrete that can withstand forklifts and heavy machinery up to 5 tons. It features masonry exterior walls and a sloped, insulated TPO roof. 

- Sustainability: The flat roof will be approximately 90% covered by solar panels. Combined with commercial energy storage, these will power the factory lighting and the entire office building. 


Requested Adjustments On the second floor of the factory, the current break room and restrooms numbers and layout are too small. Please expand it to include a counter, refrigerators, microwaves, and a seating area for approximately 50 people. This area should be situated along the front side with windows for exterior views.


Take your freedom to modify the office layouts to what is more suitable, the pictures were generated with ChatGPT and might not be perfect.

... Show more
Adnan S United States