Posted 5 Hours Ago | Job ID: 2111104 | 6 quotes received
Send before: October 23, 2025
Engineering & Architecture Engineering (Mechanical / Chemical / Civil / Electrical)
Calculate the Pre and Post runoff using the Rational Method.Calculate pipe sized from Catch basins to Detention BasinCalculate Detention basin sizeDesign Lift Station and out fall for detention basin. ... Show more
Calculate the Pre and Post runoff using the Rational Method.
Calculate pipe sized from Catch basins to Detention Basin
Calculate Detention basin size
Design Lift Station and out fall for detention basin.
Become a member to ask a question, view Q&A, and get more benefits.
Designing a house
Fixed Price | Under $250Posted: September 14, 2025
Cost Estimates PROFESSIONAL
Fixed Price or HourlyPosted: October 18, 2024
Architect Wanted - 8 Story Building
Fixed Price | $500-$1kPosted: September 21, 2025