Send before Sep 18, 2025
PROJECT OVERVIEW Project Title: Passive Building Performance Modeling - Residential Building, Kano Nigeria Building Type: Multi-story residential building (Ground + First Floor) Location: Kano, Nigeri…
Saudi Arabia
332 Spent | 84.6%
Send before Sep 02, 2025
Objective: To develop a non-lethal, high-pressure water-based defense mechanism connected to a 60,000-liter tank that neutralizes intruders at designated access points (e.g., main entrance doors). Som…
United States
4,900 Spent | 100%