Banner Image

Skills

  • Bill of Quantities
  • Bluebeam
  • BOQ
  • Building Estimation
  • Construction Cost Control
  • Construction Estimation
  • Cost Engineering
  • Estimation
  • Material Take Off
  • Ms Excel
  • Ms Word
  • Painting
  • PlanSwift Takeoff Software
  • Pre Construction
  • Pricing

Sign up or Log in to see more.

Services

  • CONSTRUCTION ESTIMATOR / QUANTITY SURVEY

    $12/hr Starting at $30 Ongoing

    Dedicated Resource

    Hi, Trades for which i can assist you to takeoff quantities are mentioned under: *Demolition Works * Excavation *All Concrete Works *Masonry Works *Metal Works *Wood, Plastic & Composites *Thermal and...

    Bill of QuantitiesBluebeamBOQBuilding EstimationConstruction Cost Control

About

Estimation Engineer / Quantity Engineer / Quantity Surveyor / Material Takeoff

Hi,
I am an Estimation Engineer and have an experience of more than FIFTEEN YEARS year in Cost Estimation & Quantities Takeoff of the Residential and Commercial Construction projects based on national and international. I have just started my work as a freelancer and looking for clients at the time. I can provide you with a detailed and division wise break down for every item in your estimate... I use Bluebeam and Planswift for on-screen takeoffs so you will have to provide me drawings in PDF or TIFF format...
Trades for which I guarantee full accuracy...
Demolition
Siteworks (landscaping, paving, curbs, poles, etc)
Excavation
Concrete (slabs, footings, grade beams, columns)
Masonry (Blocks, bricks, CMU)
Metals (railings, decking, beams, posts, headers, etc)
Wood, Plastic & Composites (studs, joists, posts, headers, beams, trim)
Thermal and Moisture Protection (sidings, OSB sheating, fire stopping, flashing, caulking, vapor barriers, OSB sheathing, shingle or metal roof, fascia, gutter, downspouts, frieze, etc)
Openings (detailed with hardware sets used)
Finishes (floor, wall, ceilings, exterior: GWB, STUCCO, STONE VENEER, STONE CAP, BRICK VENEER, BRICK SOLDIERS ETC )
Furnishes (countertops)
Millwork ( p lam cabinets, wooden panels, plywood panels, rod & shelve) both in lineal feet or in detail as reqd.
Electrical (fixtures counts)
Plumbing (domestic water pipes, fixtures, sanitary, utilities )
HVAC (fixtures, ducts)

Just try me once. I hope you will get used to me and will not hire anyone else in the future. I just need the drawings and specifications to start my work. I will use Bluebeam, Planswift, or Autocad to take off the quantities. I will prepare BOQ in the Excel file.
Looking forward to work with you in future.

Work Terms

Available at any time. Skype, Whatsapp.

Attachments (Click to Preview)