Skills

  • Drafting
  • Estimation
  • Monitoring
  • Planning
  • Quantity Surveying
  • Scheduling

Services

About

1. Providing services for teaching for Primavera P6 and preparation Baseline Work Program. 2. Providing services for preparing House Building Plans and Estimation of Highrise Build and Villa

Company name: Frontier Work Organization LLC (FWO UAE)
Post name: Planning /Contract Engineer
Duration: 4.5 years
Types of Projects.
a. Residential Building G + 5P +28 F in MBZ Abu Dhabi with ADCE.
b. Residential Tower G + 5P +22 F +2 P MBZ Abu Dhabi with ADCE.
c. Residential Building G + 4P + 12 F in MBZ Abu Dhabi with ADCE.
d. 2 x Residential Towers G + 4 P + M + 11 F in Shamkha Abu Dhabi with ADCE.
e. 9 x Residential Projects G + 4F+ TF in Umm Al Ashtan Abu Dhabi with Musanada.
f. Command of Military Works (4 x Residential Camp G + 4, 1 x Kitchen G + 1,
1 x Steel Parking, 5 Km Road in ZMC Abu Dhabi).
g. Command of Military Works (Foot Ball Ground, Volley Ball Ground, Swimming Pool,
Main Building for Gym and 2 Km Road at ZMC Abu Dhabi).
h. Critical Infrastructure Authority ( 8 x Precast Residential Buildings G+ 2, 2 Km Road at
Sweihan Abu Dhabi)
i. Critical Infrastructure Authority (8 x Residential Buildings G + 4 in Ruwais Abu Dhabi).
j. Construction of CICPA Facilities (3 x G+4 Buildings, Mess,Parking Roads) Mahawi.
k. LULU Hyper Market in Sheikh boot City Abu Dhabi.
l. Construction of 20 Residential Villas With ADCE Sheikhboot City in Abu Dhabi.
m. 46 Residential Villas and Infrastructure Works in Al-Ain Ramah Abu Dhabi with
Musanada.
n. Construction of Alflah Police Station in Alflah Abu Dhabi with Musanada.
o. Construction of Etisalat Data Center in Al Ain Abu Dhabi with Huawei.
p. Construction of 65 Precast Villas in Dubai.

Organization: Transportation Engineering & Planning Agency
(Lahore Development Authority)
Post name: Site Engineer
Duration: 1 year
Construction of Metro Bus System and includes following Work
a) Flyovers
Pilling Work
Pile Caps
Pier
Transom
b) Road Work
10 Km Road, Water supply and Drainage

Work Terms

Working Hours: 12 Hours,
General Payment Condition: Lumsum Project: 50% with completion of Half Work and 50% on completion of Work. or $10 per hour