Banner Image

All Services

Engineering & Architecture architecture

Quantity Surveyor

$8/hr Starting at $25

Taking off of materials, estimating the man power, tools and equipment. Preparing of bills of quantities. Measuring of quantities for all trades in construction using Bluebeam application and presenting of results in Excel tables. Tracking of mistakes in plans and reporting them to the client.

About

$8/hr Ongoing

Download Resume

Taking off of materials, estimating the man power, tools and equipment. Preparing of bills of quantities. Measuring of quantities for all trades in construction using Bluebeam application and presenting of results in Excel tables. Tracking of mistakes in plans and reporting them to the client.

Skills & Expertise

Building EstimationConstructionConstruction ResidentialCost EngineeringEstimationFloor PlanMaterialsQuantity Surveying

4 Reviews

  • Robert 1098 says,

    Great work.

    for Construction engineering on Oct 15, 2018

  • John 1401 says,

    Ivan did a good job, on time. I should have clarified that he would do a little bit first, so he could get it 100% correct first time.

    for Estimation of flooring materials on Nov 06, 2016

  • Kieran 20 says,

    I would happily use Ivan again. He was professional in his work and completed it well before the deadline. Excellent communication throughout the process and was quick to respond to queries and changes required.

    for Building plan estimation on Sep 20, 2016

  • Joseph 321 says,

    I engaged Ivan to complete a take off of a concrete and reinforcement package, the work he completed was excellent and completed in a short amount of time. I was very satisfied with the service he provided.

    for Quantity Surveying - Civil Take Off on Aug 16, 2016