Send before Mar 27, 2026
1. Concrete and Formwork (CSI Division 03) Volume Calculations: Calculate the total cubic yards/meters of concrete required for footings, columns, beams, and floor slabs. Formwork Estimation: Quantify…
Philippines
1. HVAC Systems (CSI Division 23) Equipment Quantification: Take-off of major units: Air Handling Units (AHU), Fan Coil Units (FCU), Chillers, Cooling Towers, and Condensing Units (ACCU). Ductwork Est…
responsible for preparing complete, accurate, and competitive cost estimates for electrical construction projects. This includes performing detailed material take-offs, labor calculations, and vendor…
Send before Mar 29, 2026
Cost estimation and financial analysis of new projects as well as summarizing quotations and proposals. Prepare necessary documents for project bidding. Prepares work to be estimated by gathering prop…
Send before Mar 22, 2026
Job duties description: Cost estimation and financial analysis of new projects as well as summarizing quotations and proposals. Prepare necessary documents for project bidding. Prepares work to be …
Send before Apr 30, 2026
Wind Turbine Blade Composite Materials Feasibility Consultant Summary We are seeking a senior wind turbine blade composite materials specialist to conduct a technical feasibility evaluation of a nano-…
Canada