Banner Image

All Services

Engineering & Architecture engineering (mechanical / chemical / civil / electrical)

Arc Flash Analysis (IEEE 1584-2018)| SKM

$35/hr Starting at $500

Licensed Electrical Engineer | Arc Flash Analysis (IEEE 1584-2018 ) | EasyPower, SKM, ETAP 

I deliver IEEE 1584-2018 compliant arc flash, protective device coordination,
and power systems studies — formatted for direct client submission. I work remotely with engineering firms, consultancies, and independent engineers in US, Australia, Europe, the Gulf, and 180+ countries worldwide.

Core Services:
► Arc Flash Analysis & Incident Energy Calculations (IEEE 1584-2018)
► Short Circuit Analysis — ANSI (C37) & IEC Methods
► Protective Device Coordination & Time Current Curves (TCC)
► Print-Ready Arc Flash Labels per NFPA 70E
► Renewable Energy & Grid Integration Studies

Three Tiers:
✦ Single Study — Commercial or industrial facility, 5-day delivery
✦ Biweekly Retainer — 2 studies/month with TCC, priority 3-day turnaround
✦ Remote Partner — White-label for global firms; 1, 3, 6, or 6+ month
contracts at fixed monthly or hourly rates

Software: EasyPower | ETAP | SKM PowerTools

Availability: Flexible across all global time zones

📩 Message me now with your project scope or facility details —I respond within 24 hours, anywhere in the world.

To your success
Mudassir

About

$35/hr Ongoing

Download Resume

Licensed Electrical Engineer | Arc Flash Analysis (IEEE 1584-2018 ) | EasyPower, SKM, ETAP 

I deliver IEEE 1584-2018 compliant arc flash, protective device coordination,
and power systems studies — formatted for direct client submission. I work remotely with engineering firms, consultancies, and independent engineers in US, Australia, Europe, the Gulf, and 180+ countries worldwide.

Core Services:
► Arc Flash Analysis & Incident Energy Calculations (IEEE 1584-2018)
► Short Circuit Analysis — ANSI (C37) & IEC Methods
► Protective Device Coordination & Time Current Curves (TCC)
► Print-Ready Arc Flash Labels per NFPA 70E
► Renewable Energy & Grid Integration Studies

Three Tiers:
✦ Single Study — Commercial or industrial facility, 5-day delivery
✦ Biweekly Retainer — 2 studies/month with TCC, priority 3-day turnaround
✦ Remote Partner — White-label for global firms; 1, 3, 6, or 6+ month
contracts at fixed monthly or hourly rates

Software: EasyPower | ETAP | SKM PowerTools

Availability: Flexible across all global time zones

📩 Message me now with your project scope or facility details —I respond within 24 hours, anywhere in the world.

To your success
Mudassir

Skills & Expertise

Electrical Controls DesignElectrical EngineeringEnergy EngineeringEngineeringFire EngineeringIndustrial DesignPCBSimulation Modeling

1 Reviews