Send before Apr 08, 2026
Summary REQUEST FOR ENGINEERING PROPOSAL (RFP) Production-Ready U.S.-Spec Enclosed Trailer Platform 1️⃣ Project Overview Our company is developing a vertically integrated OEM trailer manufacturing pro…
United States
59 Spent | 100%
Send before Mar 27, 2026
1. Concrete and Formwork (CSI Division 03) Volume Calculations: Calculate the total cubic yards/meters of concrete required for footings, columns, beams, and floor slabs. Formwork Estimation: Quantify…
Philippines
1. HVAC Systems (CSI Division 23) Equipment Quantification: Take-off of major units: Air Handling Units (AHU), Fan Coil Units (FCU), Chillers, Cooling Towers, and Condensing Units (ACCU). Ductwork Est…
Send before Mar 18, 2026
Industrial Manufacturing | Long-Term Engagement Location Required: Mainland China Engagement Type: Ongoing / Long-Term Compensation: Fixed + Performance Incentives About Us We are a new U.S.-bas…